NUST Institutional Repository

EOT Claim Management System using Building Information Modelling

Show simple item record

dc.contributor.author Khan, Abdullah Aamir
dc.date.accessioned 2021-09-16T10:46:15Z
dc.date.available 2021-09-16T10:46:15Z
dc.date.issued 2021
dc.identifier.uri http://10.250.8.41:8080/xmlui/handle/123456789/26100
dc.description.abstract Delays are an integral part of construction projects. In case of delays caused by reasons that are not in the control of the contractor, the contractor is entitled to Extension of Time (EOT) after the approval by the stakeholders involved. EOT Claim is one of the leading causes of disputes in construction contracts. EOT Claim generation is a lengthy process that involves specialised skills and knowledge of construction contracts. Building Information Modelling (BIM) is an emerging area of study and practice in the construction industry providing automation in a large number of construction processes. The following study focuses on the development of an Automated EOT Claim Management System that is capable of calculation of delays and EOT entitlement to contractors by using As Planned vs. As Built method of delay calculation and analysis. The system is built with the aid of a visual programming framework supported by Autodesk Revit called Dynamo. The developed plugin is capable of calculation of EOT Delays, generation of EOT Claim Document and visualisation of delays in 3D and 4D. The system aims at automating the process of EOT Claim generation by minimising human efforts. en_US
dc.publisher NUST en_US
dc.title EOT Claim Management System using Building Information Modelling en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

  • BS [136]

Show simple item record

Search DSpace


Advanced Search

Browse

My Account