NUST Institutional Repository

Identification and Elimination of Factors Causing Design Error in Building Design Process

Show simple item record

dc.contributor.author Ghazi, Muhammad Kamran
dc.date.accessioned 2022-01-24T09:04:57Z
dc.date.available 2022-01-24T09:04:57Z
dc.date.issued 2021
dc.identifier.uri http://10.250.8.41:8080/xmlui/handle/123456789/28408
dc.description.abstract Building construction is one of the most complex sector, in construction industry. Among many other, this sector has a major challenge of DM for a long. Although BIM has helped to solve some of the problems, but there are some challenges that needed to be addressed for effective DM. Though DP has improved but number of unprofessional stakeholder and evolution in material science is making it a complex system. A research was conducted to identify and value, role of DE in building construction. Research has revealed that projects are suffering due to DE in term of budget creep, and it is valued 7.92%. A major factor for DE, is ‘lack of coordination’ and followed by ‘unrealistic design schedule’. In advancement in building construction for developing countries there is need of a standard protocol for building design and approval process. A framework is therefore proposed to improve coordination process and figure out a DP which shall help industry stakeholder to properly understand DP and develop a realistic design schedule to minimize challenges to project design. en_US
dc.language.iso en en_US
dc.publisher NUST en_US
dc.title Identification and Elimination of Factors Causing Design Error in Building Design Process en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

  • MS [236]

Show simple item record

Search DSpace


Advanced Search

Browse

My Account