NUST Institutional Repository

OPTIMIZATION OF HYDRAULIC SYSTEM OF MOBILE CRANE

Show simple item record

dc.contributor.author NAZAR, UMAIR
dc.date.accessioned 2023-08-18T10:07:44Z
dc.date.available 2023-08-18T10:07:44Z
dc.date.issued 2012
dc.identifier.other 2008-NUST-MS-PHD-MTS-58
dc.identifier.uri http://10.250.8.41:8080/xmlui/handle/123456789/36877
dc.description Supervisor: DR KUNWAR FARAZ AHMAD en_US
dc.description.abstract The purpose of the study was to remove extra tensioning in the rope of tension winch and to maintain constant tension. Tension winch is attached between the crane boom and the trench cutter to create tension in a fixed rope. The problem was identified by the technical operations manager/in charge of construction machinery. A study was carried out to solve this issue. Various research papers, books and technical articles were consulted in order to devise a method by changing the existing hydraulic circuitry to achieve constant tensioning in the rope. An optimized hydraulic circuitry was made for the purpose which finally resulted in a solution that was more power efficient, economical and less space consuming than the existing circuitry. Another major benefit was the increase in the cutter weight being exerted on ground due to the removal of extra tensioning. en_US
dc.language.iso en en_US
dc.publisher College of Electrical & Mechanical Engineering (CEME), NUST en_US
dc.title OPTIMIZATION OF HYDRAULIC SYSTEM OF MOBILE CRANE en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

  • MS [205]

Show simple item record

Search DSpace


Advanced Search

Browse

My Account