NUST Institutional Repository

Productivity Analysis of Tunnel Boring Machines (TBMS) A Case Study of Neelum Hydroelectric Project(NJHEP)

Show simple item record

dc.contributor.author Khan, Sehrish
dc.date.accessioned 2023-12-11T10:36:29Z
dc.date.available 2023-12-11T10:36:29Z
dc.date.issued 2016
dc.identifier.other 15412
dc.identifier.uri http://10.250.8.41:8080/xmlui/handle/123456789/41085
dc.description Supervisor: Dr. Muhammad Jamaluddin Thaheem en_US
dc.language.iso en en_US
dc.publisher NUST SCEE en_US
dc.title Productivity Analysis of Tunnel Boring Machines (TBMS) A Case Study of Neelum Hydroelectric Project(NJHEP) en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

  • MS [236]

Show simple item record

Search DSpace


Advanced Search

Browse

My Account