NUST Institutional Repository

Pre-Feasibility Study for New Rail Link from Havelian Station to Khunjerab (Pak-China Border)

Show simple item record

dc.contributor.author Capt Babar Ali Khaliq
dc.contributor.author Dr Inam Ullah, Supervisor
dc.date.accessioned 2020-11-24T05:01:01Z
dc.date.available 2020-11-24T05:01:01Z
dc.date.issued 2020
dc.identifier.uri http://10.250.8.41:8080/xmlui/handle/123456789/13488
dc.description.abstract The reason of undertaking this project is to determine the feasibility of the railway track between Pakistan and China,since it’s the missing railway line between two countries and is of vital importance for China Pakistan Economic Corridor (CPEC).Railway line is not only necessity of an hour for the growing bilateral trade between the two countries but will also warrant an uninterrupted and continuous logistic support mechanism round the year for a division size force deployed in the region of Northern Areas. In view of above, the research was carried out to answer following questions: 1) Possible routes between Havelian and Khunjrabfor railway track.2) Analysis of all tentative routes 3) Selection of best route with relevant details of geography and topographic details Various possible routes were considered and worked upon.The natural topography and geological features were the main hurdles and obstacles in the project. Construction of tunnels was a pre-requisite for all the tracks. Moreover soil stabilization and various soil improvement methods were also required to be implemented for execution of the proposed project.` en_US
dc.language.iso en en_US
dc.publisher NUST Military College of Engineering Risalpur Cantt en_US
dc.subject Transportation Engineering en_US
dc.title Pre-Feasibility Study for New Rail Link from Havelian Station to Khunjerab (Pak-China Border) en_US


Files in this item

This item appears in the following Collection(s)

  • BS [132]

Show simple item record

Search DSpace


Advanced Search

Browse

My Account