NUST Institutional Repository

Optimization in Steam Production from Waste Heat Recovery Boiler

Show simple item record

dc.contributor.author Javed Malik, Mariam
dc.contributor.author Mujtaba, Hassan
dc.contributor.author Ahmed, Sohaib
dc.date.accessioned 2021-01-26T08:04:19Z
dc.date.available 2021-01-26T08:04:19Z
dc.date.issued 2018
dc.identifier.uri http://10.250.8.41:8080/xmlui/handle/123456789/21771
dc.description Supervisor: Dr. Zaib Jahan en_US
dc.description.abstract Our project aims to optimize steam production from Waste Heat Recovery Boiler (WHRB) by installing a condensing economizer to ensure energy recovery and cost savings. Condensing Economizer helps to reduce the stack temperature of flue gases and the steam demand of deaerator. The project is divided into five steps. Make up water and Condensate return goes to the deaerator for stripping of dissolved gases. The deaerated Boiler Feed Water goes to the Feed Water Economizer where it is heated by heat exchange with the flue gas outlet of the WHRB. The preheated water goes to the boiler where it exchanges heat with the flue gases coming from the plant. The Boiler generates steam for the process. The condensing economizer is installed to lower the stack temperature of flue gases and pre-heat the make-up water, reducing the energy demands of the Deaerator. en_US
dc.language.iso en_US en_US
dc.publisher SCME,NUST en_US
dc.title Optimization in Steam Production from Waste Heat Recovery Boiler en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

  • BS [139]

Show simple item record

Search DSpace


Advanced Search

Browse

My Account