dc.contributor.author | Asad, Fatima | |
dc.contributor.author | Nauman, Hamza | |
dc.contributor.author | Ahad, Shafay | |
dc.date.accessioned | 2020-10-27T14:47:27Z | |
dc.date.available | 2020-10-27T14:47:27Z | |
dc.date.issued | 2020 | |
dc.identifier.uri | http://10.250.8.41:8080/xmlui/handle/123456789/6267 | |
dc.description | Dr. Salman Raza Naqvi | en_US |
dc.description.abstract | Mari gas is a depleting non-renewable resource and needs to be replaced as a raw material for manufacturing of Urea. The project aims to anticipate the impacts of using a mixture of 70% Mari gas and 30% RLNG in a pre-existing ammonia plant. Material and energy balance applied on the system reviled the hydrogen production and thermal demand of the system increased. The HYSYS simulation coincided with our findings. The primary and secondary reformers, HTS and LTS reactors, Methanator and Ammonia reactor are all redesigned with some main heat exchanges. The cost analysis and HAZOP analysis of the plant is also carried out. | en_US |
dc.language.iso | en_US | en_US |
dc.publisher | SCME, NUST, Islamabad | en_US |
dc.title | USE OF ALTERNATE GAS FOR FFC UREA PLANT IN PLACE OF MARI GAS | en_US |
dc.type | Thesis | en_US |